MTW European Type Trapezium Mill

Input size:30-50mm

Capacity: 3-50t/h

LM Vertical Roller Mill

Input size:38-65mm

Capacity: 13-70t/h

Raymond Mill

Input size:20-30mm

Capacity: 0.8-9.5t/h

Sand powder vertical mill

Input size:30-55mm

Capacity: 30-900t/h

LUM series superfine vertical roller grinding mill

Input size:10-20mm

Capacity: 5-18t/h

MW Micro Powder Mill

Input size:≤20mm

Capacity: 0.5-12t/h

LM Vertical Slag Mill

Input size:38-65mm

Capacity: 7-100t/h

LM Vertical Coal Mill

Input size:≤50mm

Capacity: 5-100t/h

TGM Trapezium Mill

Input size:25-40mm

Capacity: 3-36t/h

MB5X Pendulum Roller Grinding Mill

Input size:25-55mm

Capacity: 4-100t/h

Straight-Through Centrifugal Mill

Input size:30-40mm

Capacity: 15-45t/h

Unit price of road surface demolition

  • UNIT RATES FOR DEMOLITION, RECLAMATION AND RELATED

    unit rates for demolition, reclamation and related work june 2018 Currency 31 Normal one storey brick buildings : Rands R 298,00 /m² Soft strip before demolition, excludes disposal of This document contains detailed unit price analyses for various earthworks and demolition items It provides labor, equipment, and material costs to remove structures like trees, bridges, and drainage systemsCost Sheets (Road Construction) DUPA PDF Value PROJECT COST ESTIMATE 71 GENERAL The Project Cost consisting of Civil Work Cost, ROW Acquisition Cost, Administration Cost, Consultancy Cost (D/D, C/S, and etc) The Project CHAPTER 7 PROJECT COST ESTIMATE JICA2018年4月23日  To develop a competitive demolition estimate, remember the following formula: Cost Estimate = (V x ROP x COP) + DC – SC In this formula: DC = Direct Cost; SC = Salvage Credit; V = Volume of Material to be Correctly Estimating a Demolition Project Almost

  • Cost Estimating Guide for Road Construction US Forest Service

    2020年9月8日  This Cost Guide is based on direction provided in FSH 770956 – Road Preconstruction Handbook; Chapter 70 – Plans, Specifications, and Estimates Specifications Surface Course Zamboanga City NATIONAL ROAD Road Widening 670 m 1200 m 030 m thk 015 m thk Description Water Pump Concrete Screeder Concrete Vibrator Concrete Cutter Department of Public Works and Highways2020年11月1日  As one of the three pillars in sustainability assessment, LCCA offers an empirical framework to assess costs over the entire lifespan of road projects To incorporate Implementing life cycle cost analysis in road engineering: A critical J Total Unit Cost DETAILED UNIT PRICE ANALYSIS Widening of Vitali Bridge and Approaches along Zamboanga City Pagadian City Road, Brgy Vitali, Zamboanga City, 2000 42872 DETAILED UNIT PRICE ANALYSIS

  • Detailed Unit Price Analysis PDF Scribd

    This document provides a detailed unit price analysis for item SPL3, which involves traffic control management It will require 4 traffic flags and warning signs that cost 500 each, totaling 2000 for materials Labor and equipment costs Item Bill description Unit Bill quantity Rate Amount % Type Rate Amount Net Markup% Gross 1 BILL No 1 PRELIMINARIES 11 PRELIMINARIES 111 Allow for prelims Provisional ) sum 350,000 100 350,00000 0000Indiv 1000 350,00000 1 BILL No 1 PRELIMINARIES 350,00000 350,00000 2 BILL No 2 EARTHWORKS 21 EARTHWORKS 21 SITE CLEARANCE ETCPRICED Net and GROSS BOQ DLJQSItem 101 Removal of Structures and Obstructions DPWH Accredited Contractors Materials Engineer Free download as PDF File (pdf), Text File (txt) or read online for free This document provides specifications for the removal Item 101 Removal of Structures and ObstructionsSchedule of Unit Rates PROJECT : ITEM DESCRIPTION UNIT RATE (S$) PROPOSED ADDITIONS AND ALTERATIONS WORKS FOR OFFICE OF FOOTBALL ASSOCIATION OF SINGAPORE @ 100 TYRWHITT ROAD, JALAN BESAR STADIUM, SINGAPORE B) B1 m² B2 mr B3 m² B4 mr B5 m² B6 m² B7 m² B8 each B9 m² B10 m² Supply and install SCHEDULE OF UNIT RATES (ID WORKS) FAS

  • Unit Price Averages Reports Albertaca

    Unit Price Averages Reports B180 Preparing Subgrade Surface (First Layer) 6 $135,614 593,660 m2 $023 B181 Preparing Subgrade Surface (Second Layer) 1 $3,238 2,280 m2 $142 B282 Granular Base Course ‐ Des 2 Cl 25 5 $7,476,409 522,400 t $1431 D100 ITEM NO UNIT B5 ls I QUANITY UNIT AMOUNT (PhP) M A 64 sqft T 60 bdft E 3 pcs R 200 kgs I A L S II NOOF PERSONNEL NOOF HOURS AMOUNT (PhP) L 1 8 A 1 8 B O R III QUANITY UNIT AMOUNT (PhP) E Q U I P M E N T IV V VI VII Name of Bidder's Authorized Representative: Position/Designation: UNIT PRICE ANALYSIS DESCRIPTION OF ITEM UNIT PRICE ANALYSISThe document provides a detailed unit price analysis for upgrading a farm to market road from Purok 4 to Purok 8 in Tagbitanag, Samal District, Philippines It includes 3 items construction survey and staking for 1372 km estimated to cost $55,87175; 2 project billboards costing $11,03008 each; and an occupational safety and health program lumpsum cost of Detailed Unit Price Analysis DUPA2017年11月26日  construction and demolition materials with clay for road pavement subgrade, Road Materials and Pavement Design, DOI: 101080/2017 To link to this article: https://doior g/101080 Utilisation of construction and demolition materials with clay for road

  • SECTION 1: ROAD WORKS AN INTERIM GUIDE ON STANDARD

    SECTION 1: ROAD WORKS KERAJAAN MALAYSIA AN INTERIM GUIDE ON STANDARD BILL OF QUANTITIES SECTION 1: ROAD WORKS Ketua Pengarah Kerja Raya Jabatan Kerja Raya Malaysia Jalan Sultan Salahuddin 50582 Kuala Lumpur NTJ 26/08 (Pindaan 2016) JKR 20401006415 ©2016 Jabatan Kerja Raya Malaysia Hak Cipta Terpelihara2023年3月22日  As the surface breaks apart, it will also lift from the ground below it, making it easy to lift and remove from the surface For an asphalt resurfacing project where you’d only remove part of the asphalt, you can use the circular saw StepbyStep Guide to Asphalt Removal with Average CostsWhen it is necessary to build, construct, or install on the subsurface or subterranean portion of private and government lands owned, occupied, or leased by other persons, such infrastructure as subways, tunnels, underpasses, waterways, floodways, or utility facilities as part of the government’s infrastructure and development project, the government or any of its authorized REPUBLIC ACT No 10752 The Lawphil ProjectErrors brought to our notice will be corrected immediately, however, the publishers accept no responsibility or liability whatsoever regarding the use of the price data published This survey was conducted between 10th – 20th May 2023Indicative Basic Material Prices Ghana Institution of Surveyors

  • General item ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

    ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT NO B1201 Contractor's compliance with Environmental Lump sum 100 Moveable barricade/road sign combination ( 6m wide) Delineators (DTG50J) (600mm high )x 200mm wide: 20km Speed limit 1701 Clear surface and grub vegetation and bushes (a) ha 100 1702 (a) No 100 5500 1709/5 504Asphalt is a durable and versatile material commonly used for driveways, parking lots, and roads However, even the most wellconstructed asphalt surfaces will eventually deteriorate and require removal Whether you’re a homeowner, business owner, or contractor, understanding the process of asphalt demolition is essential for ensuring a safe, efficient, and costeffective projectThe Ultimate Guide to Asphalt Demolition: Process, Cost, and FAQCONSTRUCTION AND DEMOLITION WASTE IN ROAD SECTOR IRC:1212017 GUIDELINES FOR USE INDIAN ROADS CONGRESS Kama Koti Marg, Sector6, RK Puram, New Delhi110 022 NOVEMBER, 2017 Price : ` 300/ (Plus Packing Postage) IRC:1212017 First Published : November degradation Dumping of CD waste across our cities chokes rivers, GUIDELINES FOR USE OF CONSTRUCTION AND DEMOLITION WASTE IN ROAD 2021年10月16日  Price Change; Price Amount Percent Last Checked; Cement OPC Mugar: 72000 Br per quintal: Oct 16, 2021: Cement PPC Mugar: 1,50000 Br per quintal: Aug 10, 2024: Cement PPC MeseboConcrete Work Material Prices in Addis Ababa 2merkato

  • SECTION7: BILL OF QUANTITIES

    price that is obtained by multiplying the unit price and quantity, the unit price shall prevail Payment of items under Bill No 9 “Safety in Road Construction” shall be made only after AND SURFACE COURSES (NON BITUMINOUS) AND SHOULDERS Bill No 5 BASE AND SURFACE COURSES (BITUMINOUS)Understanding the Price Ranges: The information mentions two main scenarios for asphalt paving: Demo and Install: This involves removing the existing surface (demolition) before installing new asphalt The cost range is $1120 (low) to $4 (PSF) (high)A Comprehensive Guide to Calculating Asphalt Paving CostsITEM NO DESCRIPTION % OF TOTAL UNIT QUANTITY DIRECT COST TOTAL UNIT COST Service Crane 1 2 8 Jackhammer 2 8 Backhoe 1 2 2 Bulldozer 1 2 2 Water Truck 1 Transit Mixer 1 1 Payloader 1 Bagger Mixer 2 2 Cargo Truck (10T, 270 Hp) 1 Bar Bender 2 Materials Engineer 1 No Dumptruck (10 cum) 1 Bar Cutter, Single Phase 2 Project Engineer 1 Republic of ESTIMATED COST OF PROPOSED WORKWY Free download as PDF File (pdf), Text File (txt) or read online for free This document provides a detailed unit price analysis for the repair and rehabilitation of the AbraIlocos Norte Road involving reflective thermoplastic pavement markings It details the labor, equipment, and materials costs for applying 1,15944 sqm of white and 44436 sqm of yellow thermoplastic Detailed Unit Price Analysis (Dupa) PDF Road Surface Scribd

  • Dpwh cost estimate guidelines EQUIPMENT

    Preparation of dirth/earth road or application of gravel Item 200 or Item 201 or 300 = 12,500 sq m/day Preparation of gravel road for the construction of Asphalt Concrete Pavement = 9,000 sq m/day A Compaction Required 2024年11月25日  T hinking of building a new home, swimming pool, or basement? First, you’ll need to make sure excavation costs—which average $3,990, but can fall between $1,662 and $6,728—fit into your home 2024 Excavation Cost: A Complete Price Guide Angi1 Each pay item should have a unit price and a total price 2 If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern 3 If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price 4VILLAGE OF BARRINGTON ADDENDUM NO 2 TO THE CONTRACT 1 The document compares unit rates for various items between different road construction contracts in Ethiopia It includes items related to STD prevention measures, temporary facilities for engineers, earthworks, drainage works and more 2 Unit rates for similar items can vary significantly between contracts For example, the rate for excavation of open drains in soft Unit Rate Comparision For DBST: Average PDF Road Surface

  • County of San Diego

    Unit Price List Draft: July 2021 Note: Unit Price list will increase annually using the May Engineering and News Report (ENR) CCI Index Table of Contents IRRIGATION 4 STORM DRAIN SYSTEMS 45 TCBMPs/SBMPs 56 SURFACE IMPROVEMENT 67 TRAFFIC 7 UTILITIES 8 ASEWER 8 BWATER 89 MISCELLANEOUS 10Surface Course Zamboanga City NATIONAL ROAD Road Widening 670 m 1200 m 030 m thk 015 m thk Length 195 km 0+00000 Net Length: Lane Kilometer: NO 2 2 Description DETAILED UNIT PRICE ANALYSIS Construction of ByPass and Diversion Roads Vitali Department of Public Works and HighwaysLocation: Main Campus, Tarlac State University Qty Unit Unit Price Total Price 2 Demolition, Cleaning, Hauling, Disposal and Repair Works 22 Hauling and Disposal of Debris and Scrap Materials from affectedDetailed Unit Price Analysis Tarlac State University00 GENERAL REGULATIONS GENERAL REGULATIONS (CONT'D) Associated I (f) (xxi) Testing and Commissioning Procedure for Electrical Installation in Government documents Buildings of the Hong Kong Special Administrative Region issued by Architectural (Cont'd) Services Department (xxii) Testing and Commissioning Procedure for Airconditioning, SCHEDULE OF RATES Architectural Services Department

  • Government Buildings BSR 2021

    construction bsr 2021 contents page nos a introductory notes additions to specifications a1 introductory notes a1a3 a2 additions to specifications a4a7 b pricing preambles b1b16 c demolitions c1 d excavation earthwork d1d2 f concrete work f1f4 g masonry work g1g2 h water profing h1 j structural metal work j1 k metal work k1k6 l wood work l1l11 l1 carpentry For each cluster, it lists items of work to be done, their quantities, units, unit prices, and total amounts The items include clearing, excavation, concrete works, and safety programs The document provides an itemized cost estimate for infrastructure rehabilitation projects across multiple locations in Tabaco City8 Section VIII Bill of Quantities Various Infra Revised PDF Road Name and Specifications Quantity Unit Unit Cost Amount 1,064,09299 784,76858 17677 Subtotal for E 13,301,16235 1,330,11624 For Disposal DETAILED UNIT PRICE ANALYSIS Road Upgrading (Gravel to Concrete) of Jct Tagasilay along MCLL Highway Tagasilay Vitali Section Leading to Merloquet Falls, Vitali, Zamboanga City 24000DETAILED UNIT PRICE ANALYSISADD 5% OF CONTRACT PRICE ADJUSTMENT SUBTOTAL ADD 15% OF VAT TOTAL COST FOR CONSTRUCTION ITEM DESCRIPTION UNIT QTY RATE AMOUNT R SECTION 5600 ROAD SIGNS 56,01 Road sign boards with painted or coloured semimatt background Surface preparation for bedding the gabions m2 6 B5203 Gabions: (a) COST ESTIMATE eTenders

  • StepbyStep Guide to Asphalt Road Construction

    2024年3月1日  A1: Asphalt road construction typically involves several key steps, including demolition and removal of existing surfaces, grading and sloping for proper drainage, preparing the sub base for stability, proof rolling and Over 20,000 unit price line items covering all 16 divisions of the CSI Master Format This extensive RS Means building construction cost data base is ideal for construction cost estimating of new construction and major renovations for commercial and industrial projects costing $500,000 and up All units are in MetricUnit Cost Databases ProEstcontractor's omission to price any item will be entertained Prices for all construction equipment, temporary works, services and other items shall include for the supply, maintenance, operating cost and subsequent removal and making good as necessary Abbreviated descriptions The items in these bills of quantities utilise abbreviated descriptionsSection 4 Provisional Bills of Quantities Section 4DETAILED UNIT PRICE ANALYSIS Widening of San Ramon Bridge 2 (B01162MN) along Zamboanga City Labuan Limpapa Road, PMN, Zamboanga City 5000 15500 Designation No of Persons No of Days Daily Rate PROJECT NAME: Item No/Description: 104(1)bEmbankment, Common BorrowDETAILED UNIT PRICE ANALYSIS

  • FAST TRACK TOTAL SURFACE SELECTIVE HYDRO DEMOLITION

    Fast Track Total Surface Selective HydroDemolition Equipment The hydrodemolition equipment shall consist of a water supply system, a high pressure water pumping system, and a demolition type unit The demolition unit shall be a robotic, computerized, and selfpropelled unit, utilizing a high pressure water jet stream that is capable ofHow much asphalt removal should cost Average costs and comments from CostHelper's team of professional journalists and community of users Costs for doityourself asphalt removal might range from zero to $100$500 or more depending on local dump/recycling fees; how much equipment needs to be rented; the size of the area being removed and whether it's attached to 2024 Cost of Asphalt Removal Estimates and Prices PaidQty Unit Unit Price Total Price 2 Demolition, Hauling, Disposal, and Repair Works 21 Demolition/Removal/Repair of existing CHB walls, Replacement of defected window hinges, handle, broken glass and all other affected areas 1 lot A Item NoDetailed Unit Price Analysis Tarlac State UniversityDetailed Unit Price Analysis Free download as Word Doc (doc / docx), PDF File (pdf), Text File (txt) or read online for free This document provides 3 detailed unit price analyses for construction projects Analysis 1 is for sewer line works and includes labor, equipment, materials and total unit cost calculations Analysis 2 is for cold water lines and follows the same formatDetailed Unit Price Analysis PDF Value Added Tax Scribd

  • Where can I get quicklime calcium oxide high calcium powder
  • 50 tons per hour granodiorite heavy calcium carbonate Raymond mill
  • 200T per hour prepowder grinding powder vertical grinding fine sand powder equipment
  • Calcium carbonate crusher coal
  • Method for processing attapulgite powder
  • Cement grinding roller weight
  • Stone specification classification
  • Production process of powder seasoning
  • Porosity of 1 cubic meter of sand
  • 40 tons per hour hydraulic barite grinding machine
  • Mining vertical grinding machine
  • Source manufacturer Okada 165 grinding machine
  • high limestone stone machine
  • Can vertical roller mill process coal powder
  • Precision doublesided grinder AC700F Germany
  • Limestone crusher powder ore mill
  • Mining ultrafine powder machine small dry mill grinding machine
  • Shanghai Yuhao talc powder equipment Raymond mill
  • Xilinhot Shenhua Xilinhot Shenhua Xilinhot Shenhua
  • Is there a machine for selling powder spodumene in Cangzhou
  • Chinese coal mill
  • The correct installation method of rolling bearings for quicklime limestone crusher
  • s95 ore powder
  • How much does a mill oil scraper cost
  • Profile highfine vertical mill modified to cut stone
  • Uses of Wuxi water treatment cracking carbon black 6
  • Calcinated quicklime mill Heavy calcium powder machine
  • Can the roller ore mill control the shape of the material
  • Purely imported large crusher
  • Does bentonite require geological survey